Floor Levelling Pump Hire

Professional pump hire for floor levelling compounds

A flawless finish starts with an efficient pour. Our MTEC 330 3phase electric pump hire service will take the heavy lifting out of your project, whether you are a specialist UFH installer or a commercial contractor. We provide high-performance equipment alongside an operative (if required), so you can be sure your levelling compound or screed is poured with precision and speed.

What’s included in your hire:

  • MTEC 330 3phase electric pump – High-performance machinery optimised for thin-set levelling compounds.
  • Specialist Pump Operative – An experienced professional who handles on-site setup and pipe placement, remaining with you throughout the pour.
  • 50 Metres of Hose – Standard reach included as part of the package, with additional hose available for more complex site layouts.
  • Flexible Half-Day Booking – Professional service charged in half-day increments to fit in with your site schedule.
  • Technical Assistance – On-site support to ensure the pump runs smoothly, allowing your team to focus on the levelling process.

Why choose us?

Contact Info

Fast-track your floor prep with a CFL quote

Keep your project on track with a rapid response from the CFL team.

Contact us now for your free quote.

Call today

01206 648 158

Email us

info@floorlevelling.co.uk

3 Benefits of professional pumping

4 Benefits of professional pumping
pump hire provider

When you are installing thin-set compounds, precision is everything. Having the use of a MTEC 330 3phase electric pump on site gives you total control over the delivery.

  1. Consistent Material Flow – Achieve a consistent mix throughout the pour, reducing the risk of air pockets or uneven thickness.
  2. Protect the Cure Cycle – Floor levelling compounds start to set within 15 minutes. Pumping allows large surface areas before the chemical reaction begins.
  3. Cleaner Site Operations – Pumping material through 50 metres of hose keeps the installation area clear of dust and debris.

Frequently asked questions

Here are some of the questions we get asked most regularly by our pump hire clients.

Our standard horizontal reach is 50 metres, but the pump is capable of handling greater vertical lifts for multi-storey projects. If you are pumping to upper floors, let us know the elevation details so we can ensure the pressure settings and hose securement are optimised for the lift.

The MTEC 330 3phase electric pump is a specialist machine for "flowing" materials. It is perfect for levelling compounds. It’s not suitable though for liquid screed and traditional sand and cement screeds. If you're unsure about your specific material, just ask.

Our operative is trained to minimise "line waste" by ensuring the pipes are cleared effectively. You’ll still need to allow for a small amount of residual material (approx. 20–30 litres) within the 50-metre hose length, though, which is standard for any pumping operation.

Our operative will typically arrive 1 hour before your scheduled pour to set up the 50-metre hose run and prime the pump. Similarly, allow roughly 1 hour at the end of the session for a thorough washout and equipment pack-down. This is all included within your half-day hire window.

Call for a free quote

Request a free, no-obligation quote today and let Collie Floor Levelling provide expert advice and professional pump hire tailored to your project. 01206 648 158.